County Road 300N
City of Warsaw, IN
A&Z provided design services for improvements to CR 300 N between CR 150W and CR 200W. This project supported the City of Warsaw’s efforts to improve access and infrastructure serving as its shovel-ready innovation and research sites. Approximately 3,000 feet of CR 300N required full reconstruction of the existing gravel roadway along with enclosed storm drainage and dedicated left turn lanes at the adjoining intersection. A&Z’s services included topographic survey, right-of-way engineering, utility coordination, and storm drainage improvements.
- Full reconstruction of approximately 3,000 feet of CR 300N
- Dedicated left-turn lanes at CR 200W
- Drainage improvements
- Storm drainage inlets, manholes, and an outfall
- Signage, and pavement markings
- Topographic survey and establishment of roadway, property, and right-of-way lines
- Utility coordination
- Right-of-way engineering