Husky Trail Road Rehabilitation and Roundabout
City of Warsaw, IN
Project Summary:
A&Z Engineering provided design services for the Husky Trail Road rehabilitation and roundabout project, enhancing a 3,270-foot corridor on the northeast side of Warsaw. Improvements included partial reconstruction and widening to a three-lane section with curb and gutter, turn lanes, sidewalks, street lighting, and a new storm sewer system. At the intersection of Mariners Drive and Husky Trail, A&Z designed a modern roundabout to improve safety and traffic flow, accommodating large trucks and school buses while supporting future growth in the area.
Key Design Elements:
- Partial roadway reconstruction and pavement widening
- Three-lane roadway design (11-foot lanes with 12-foot center turn lane)
- Curb and gutter installation along both sides
- Dedicated turn lanes at public road approaches
- Sidewalks and pedestrian connectivity improvements
- Street lighting for enhanced safety and visibility
- New closed storm sewer system and drive approaches
- Roundabout design at Husky Trail and Mariners Drive
- Utility coordination and right-of-way engineering