Winona-Lake City Greenway CE

Winona-Lake City Greenway CE

This Project is a 2.2 mile Lake City Greenway Trail for the Town of Winona Lake. The Project consisted of two typical trail sections, a 10-foot wide concrete section in the downtown area, and a

12-foot asphalt pavement section inside the former Chicago Boys Club park area. The project included special trail directional signs, a parking area, special gates, and seawall design along the

Winona Lake Canal.

Client Reference: Craig Allebach, Town Coordinator, 574-269-5112

Construction Cost approximately: $1.3 million

Watch Videos

Contact Us Today