The project is located within the Steuben County Limits at the intersection of C.R. 200N and C.R. 200W. The project included the addition of a traffic signal at the intersection of C.R. 200N and C.R. 200W, as well as the addition of an exclusive right turn lane on C.R. 200N. This project improved the sight distance east of the intersection on C.R. 200N. An exclusive right turn lane was constructed on Crooked Lake Lane 101 to better align the thru travel lanes on C.R. 200N and Crooked Lake Lane 101.

Construction cost approximately: $800K