Coldwater Road Concrete Street Rehabilitation

Coldwater Road Concrete Street Rehabilitation

Coldwater Road is located between Coliseum Blvd (S.R. 930) and Washington Center Road. The existing pavement was constructed with 10" plain concrete pavement.

The proposed project improvements include rehabilitation of the existing concrete pavement by repairing joints, patching pavement, and partial pavement reconstruction. The existing pavement will be milled off and resurfaced with HMA pavement. Composite Geofabric will be placed over the existing longitudinal joints and transverse joints to prevent reflective cracking. Ground Penetration Radar (GPR) was used to evaluate the condition of the existing concrete pavement and subbase materials during pavement assessment.

Raised landscaping median will be incorporated with the proposed roadway typical cross section to introduce greenspace and reduce impervious pavement. Other improvements include traffic signal modifications, sidewalk repairs, and ADA curb ramp improvements.

The estimated construction cost is $2.5 million

Contact Us Today