Antwerp Rd Bridge Design

Antwerp Rd Bridge Design

The project consists of replacing the existing structure with a three span, cast-in-place concrete slab bridge. The new bridge will be designed with an increase overall span lenght to provide 2:1 embankment side slopes. Sizing the Structure by hydraulic analysis is not included. Concrete approach slabs willl be provided. Guardrail design will be completed.

Contact Us Today